Laserfiche WebLink
Bond Release - 2 - September 8, 2016 <br />9. Bonds: Corporate Surety, Bond $3,154,277.10 <br />Corporate Surety, Bond $2,075,253.00 <br />Corporate Surety, Bond $2,217,169.51 <br />Corporate Surety, Bond $2,500,000.00 <br />Corporate Surety, Bond $ 2,500,000.00 <br />10. Current Total Bond Amount: $12,446,699.61 <br />11. Original Total Bond Amount: 4,200,000 <br />12. Dollar Amount Requested for Release: $ 350,000 <br />13. Legal Description of Area Requested: Portions of: <br />Township <br />13 South, Range 91 West, 6th PM <br />Sec. 5: <br />S/2SW/4 <br />Sec. 7: <br />Lots 1, 2, 4, E/2NW/4, SE/4SW/4 <br />Sec. 10: <br />SW/4SW/4 <br />Sec. 11: <br />NW/4NW/4, SW/4SW/4 <br />Sec. 14: <br />NW/4 <br />Sec. 15: <br />NW/4NW/4, NE/4 <br />Township <br />13 South, Range 92West, 6t" PM <br />Sec: 1: <br />SW/4, S/2NW/4, Lot 2 <br />Sec. 12: <br />Lots 1, 2, T8, 10, 11 <br />Township <br />12 South, Range 91 West, 6th PM <br />Sec. 33: <br />Lot 10 <br />Sec. 34: <br />Lot 12 <br />14. A Map Showing Areas: The updated 2015 Annual Reclamation Report Map is <br />enclosed. <br />15. During the period 2003 through 2016, numerous drill pads and roads were <br />graded to approximate original contour and seeded. During the same period of <br />time numerous gob vent and exploration holes were sealed. During 2015 ten <br />drill sites and two roads were restored to approximate original contours. Soil <br />cover and topsoil were placed on 4.5 acres of gob pile #1 during 2014. Gob pile <br />#1 and gob pile #2 have a combined 7.4 acres covered with 3.5 feet of soil. <br />16. A description of results achieved: The ten drill sites and two roads representing <br />12.3 acres are eligible for Phase I bond release. The 11.9 acres at gob pile #1 <br />and #2 that have been covered with 3.5 feet of soil are also eligible for Phase 1 <br />bond release. There are 33 drill holes that have been permanently abandoned <br />and sealed that are eligible for Phase I, II and III bond release. <br />All reclamation work has been performed in accordance with plans approved by <br />the Division of Reclamation Mining and Safety. <br />The following seed mixes were used for the reclamation from 2003 through <br />2015. <br />