Laserfiche WebLink
Option 2— Not Exposing Groundwater <br /> Dewatering Phase 1 lake 0.25 6570 <br /> Backfilling 1000 feet of 10 foot tall highwall to 3H:1 V. 0.5 4050 <br /> Backfill and grade detention pond 0.25 9300 <br /> Rip road areas 0.25 1000 <br /> Replace topsoil on all disturbed areas 1.0 61952 <br /> Remove all facilities and equipment 0.25 5000 <br /> Seed and mulch all topsoiled areas 0.25 17920 <br /> Totals 2.5 $105,792 <br /> DRMS Costs 28%x direct costs $29,622 <br /> Total Bond Amount Option 2 $135,414 <br /> 5 Mile Pit March 2016 L-4 <br />