Laserfiche WebLink
0 <br /> Colorado Division of Reclamation, Mining& Safety <br /> September 8, 2016 <br /> Page 2 <br /> • Stockpile Volumes <br /> o No material is stockpiled at the Neilson Pit <br /> • Pounds of Pure Live Seed(PLS)per acre per species <br /> o Please see Exhibit D—Reclamation Plan <br /> Finally, it is noted on the permit(issued on June 8,2007)by the Division that the mineral <br /> to be extracted is Tellurium. Tri-State believes this is an error that needs to be corrected. The <br /> correct aggregate extracted from the Neilson Pit is scoria. This is also stated in the permit in <br /> Section 6.3.3.6 -Primary and Secondary Commodities <br /> Also enclosed please find a change of index sheet to ease incorporation of the technical <br /> revision materials into the permit. The required fee of $216.00 for the technical revision has <br /> already been sent to your office and should have been received prior to this package arriving. If <br /> you should have any additional questions or concerns regarding this technical revision or require <br /> any clarification for the recalculation of the bond liability please feel free to contact Tony <br /> Tennyson at(970) 824-1232 or ttennyson&tristategt.ororg at your convenience. <br /> Sincerely, <br /> 4/a1 4t�� <br /> Dan Casiraro <br /> Senior Manger <br /> Environmental Services <br /> DJC:TT:dbr <br /> Enclosure <br /> cc: Chris Gilbreath(via email) <br /> Tony Tennyson(via email) <br /> Angela Aalbers(via email) <br /> File: C.F. 1.1.9 <br /> G471-11.3(21)b <br /> AN EQUAL OPPORTUNITY/AFFIRMATIVE ACTION EMPLOYER <br /> A Touchstone EnereCooperative ?O�k( <br />