Laserfiche WebLink
EXHIBIT F <br /> Reclamation Plan Map <br /> This revision proposes to update the reclamation plan to reflect the current landscape of the <br /> Longmont Distel Operations site and to identify remaining areas for post-mining reclamation and <br /> areas for flood restoration following the catastrophic flood event throughout the St. Vrain Creek <br /> watershed in September 2013. The following Exhibit F-1 —Post 2013 Flood Conditions, <br /> Restoration, Improvements and Remaining Post-Mining Reclamation identifies these areas. <br /> Also enclosed in this section is a copy of City of Longmont's Resilient Saint Wain Project—Sandstone <br /> Ranch Reach,July 2016, Volume 2—Construction Drawings plan set. These are the 100%drawings(bid <br /> documents)for the City's flood restoration project within the Longmont Distel operation. <br /> Longmont Distel Operations <br /> Amendment to Permit M-1989-029 <br />