Laserfiche WebLink
New Elk Mine (C-1981-012) <br />Minor Revisions since the last Mid Term Review (Mid Term Review 6) Approved 29 October 2012. <br />Revision Number <br />Description <br />Proposed Decision Date <br />MR 123 <br />Transfer two water monitoring well into permit <br />31 August 2015 <br />MR 122 <br />Incorporate updated Exhibit 19 pages <br />21 November 2014 <br />MR 121 <br />Update Mas 13 and 13 A <br />13 May 2013 <br />MR 120 <br />Facilities updates for new buildings <br />17 January 2014 <br />MR 119 <br />Facilities updates for parking and materials storage <br />8 March 2013 <br />Table 3. Minor Revisions since 2012. <br />There were no Permit Transfers since the last Mid Term Review (MT 6) that was approved 29 October <br />2012. <br />There have been no Bond Releases since the last Renewal (Renewal No. 5) approved 6 March 2009. <br />Renewal 6 has not yet been issued. <br />The stipulation history for the New Elk Mine was reviewed as part of the midterm review. The review included <br />an investigation of any stipulations imposed since the last permit renewal, and any responses to existing <br />stipulations received since the last permit renewal. Any stipulations associated with this permit and issued over <br />the life of this operation which are not discussed in this midterm review have been complied with or terminated. <br />Stipulations consist of timely submissions of the reports and inspections identified in table 4, below. All reports <br />and inspections have been submitted. <br />Annual Hydrology Report <br />Pond Inspections <br />Discharge Monitoring Reports <br />Annual Reclamation Report <br />Refuse Pile Inspections <br />Table 4. Types of reports and inspections required by Colorado Mined Land Reclamation Board Rules. <br />New Elk Mine C1981 012 Mid Term 7 Page 5 <br />Date: August 2016 Prepared by: R. Reilley File location: M:\Coal\Findings <br />