Laserfiche WebLink
Job Condition Correction Factor <br />Operator Skill: <br />0.900 <br />Material consistency: <br />1.100 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />1.000 <br />Push gradient: <br />1.000 <br />Altitude: <br />1.000 <br />Material Weight: <br />1.438 <br />Blade type: <br />1.000 <br />Net correction: 1.1816 <br />Adjusted unit 361.10 LCY/hr <br />production: <br />Adjusted fleet 1083.3 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 3 Dozer(s) <br />Unit cost: $0.665/LCY <br />Total job time: 12.23 Hours <br />Total job cost: $8,805 <br />Source <br />(AB.AVG.) <br />(CAT HB) <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />Page 10 of 161 <br />CIRCES Cost Estimating Software <br />