My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-25_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2016-08-25_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 9:06:52 AM
Creation date
9/12/2016 10:41:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
8/25/2016
Doc Name
Midterm Review Document
From
DRMS
To
New Elk Coal Company, LLC
Type & Sequence
MT7
Email Name
RAR
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck Cvcle Time: <br />Truck Exchange Time: 0.50 Minutes <br />Truck Load Time: 0.530 Minutes <br />Truck Maneuver and Dump 0.90 Minutes <br />Time: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Adjusted for site altitude: <br />Page 8of161 <br />0.500 <br />Minutes <br />0.530 <br />Minutes <br />0.900 <br />Minutes <br />Truck Travel (Haul & Return) Time: <br />Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />maintained 3.0 <br />Grade (%) <br />Roll. Res <br />Total Res <br />Haul Route: <br />Travel <br />Loading Tool unit <br />Seg # <br />Haul Distance <br />Grade (%) <br />(%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />162.82 <br />(Ft) <br />135.14 LCY/Hour <br />Optimal No. of Trucks: <br />(%) <br />(%) <br />(fpm) <br />Time <br />1500.00 <br />-4.00 <br />3.00 <br />-1.00 <br />2938 <br />0.567 <br />LCY/Hour <br />min <br />LCY/Hour <br />JOB TIME AND COST <br />1 <br />1500.00 <br />4.00 <br />1 <br />3.00 <br />7.00 <br />1568 <br />0.989 <br />/LCY Total job cost: $47,920 <br />Haul Time: <br />0.989 <br />minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />162.82 <br />LCY/Hour Adjusted for job efficiency: <br />135.14 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />1 <br />1500.00 <br />-4.00 <br />3.00 <br />-1.00 <br />2938 <br />0.567 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 0.567 <br />minutes <br />Total Truck Cycle Time: 3.486 <br />minutes <br />Loading Tool unit <br />Production <br />551.07 <br />LCY/Hour Adjusted for job efficiency: <br />457.39 LCY/Hour <br />Truck Unit Production <br />162.82 <br />LCY/Hour Adjusted for job efficiency: <br />135.14 LCY/Hour <br />Optimal No. of Trucks: <br />3 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 405.43 <br />LCY/Hour <br />Adjusted single truck/loader team production: 405.43 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 405.43 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 48.56 <br />Hours <br />Unit cost: <br />$2.434 <br />/LCY Total job cost: $47,920 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.