My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-02_REPORT - M2000154
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2000154
>
2016-09-02_REPORT - M2000154
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 12:18:10 PM
Creation date
9/7/2016 9:22:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000154
IBM Index Class Name
REPORT
Doc Date
9/2/2016
Doc Name
Annual Fee/Report/Map
From
Hankins Stone Company, Inc.
To
DRMS
Annual Report Year
2016
Email Name
LJW
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`Vf falY LIIf aYY UI.(KVJ YY III IVl{LLIf LLIV 1LL Jl 111J14aLLtlt.aaL 4J JVVYa I/� aVt. VVV. v.aa✓J/�a/r,/Vraa✓ a vu ttau� atV/w,✓af,aa/aaau vvaa•a wv• ..awaaV wa <br /> your full and faithful performance and will apply it to the last BLM's written approval, <br /> installment required to make the total payment equal to the total price <br /> given in Section 2. Sec. 10.Modification of the Approved Mining.or Reclamation Plan- <br /> You or BLM may initiate modification of these plans to adjust for <br /> The total purchase price equals the sum of the total quantities changed conditions,or to correct any oversight.The conditions for <br /> removed,multiplied by their respective unit prices. BLM requiring you to modify these plans,or approving your request <br /> fnr mnAifiratinn ara fniind in ttiP rPonlatinne nt Xi rFR i6ni dd <br /> remove an more material <br /> y until you have paid.Removing material 4 5ee. 11.hxptratton of contract- t his contract win expire <br /> you have not paid for is trespass,and for trespass you must pay at 1 years, 0 months, 0 days from its <br /> triple the appraised unit price,or at triple the reappraised unit price approval date,unless BLM extends the term or renews the contract. <br /> if BLM has made a reappraisal.To resume removal operations after <br /> you were late making payments,you must obtain BLM's written ❑BLM will check this box if this contract is a renewable <br /> approval. competitive contract. <br /> 1,4iu iui u,ciu auuu onu4%'1'ou uioul. before your renewable competitive contract expires and you meet the <br /> Sec. 4. Risk of loss-You assume complete risk of loss for all conditions in the regulations at 43 CFR 3602,47. <br /> materials to which you have title.If material covered by this Sec. 13. Violations and cancellations- (a)If you violate any terms <br /> contract is damaged or destroyed before title passes,you are liable or provisions of this contract,BLM may cancel your contract <br /> for all loss suffered if you or your agents are directly or indirectly following the regulations at 43 CFR 3601.60 et seq.,and recover all <br /> responsible for the damages.If you are not responsible for the damages suffered by the United States,including applying any <br /> of this contract.You are still liable for breach of contract or any <br /> wrongful or negligent act. (b)If you extract any mineral materials sold under this contract <br /> during the suspension period,or after the contract has expired or been <br /> Sec. 5. Liability for damage to materials not sold to you-You are canceled,you have committed,and may be charged with,willful <br /> liable for loss or damage to materials not sold to you if you or your trespass. <br /> agents are directly or indirectly responsible for the damage or loss. <br /> _____ ____ Sec 14- Racnnnmihilitvfnrdamnae.csufTerednr costs incurred hvthe <br /> resulting from your breach of any contract term or your failure to nreacn tnrs contract or commit any wrongruu or negugent act,you are <br /> use proper conservation practices.If the damage resulted from liable for any resulting damages suffered or costs incurred by the <br /> willful or gross negligence,you are liable for triple the appraised United States.You must pay the United States within 30 days after <br /> value of the damaged or destroyed materials.If the damage or receiving a written demand from BLM. <br /> destruction did not result from willful or gross negligence,you are Sec. 15.Extensions of time-BLM may grant you an extension of <br /> liable for lesser charges,but not less than the appraised value of the time in which to comply with contract provisions under the <br /> 'ftl'.lt'P.YIAIC __�_�_a:_.__ _. ♦� r.rn ^rrnn n� r_____.-__`___._.t.._�.... .._..,_nn .7._.._ <br /> ,ec. e.wiputatnons ana reservea terms- Your rignts are suoject to me your contract expires.For contracts with terms of 90 days or less you <br /> regulations at 43 CFR Group 3600 and to any stipulations and the must apply no later than 15 days before your contract expires. <br /> mining plan attached to this contract. <br /> D BLM will check this box if there are stipulations attached to Sec. 16. Time for removing personal property-You have <br /> this contract. 90 days(not to exceed 90)from the date this contract expires <br /> to remove your equipment,improvements,and other personal property <br /> Sec. 7.Notice of operations-You must notify BLM immediately from United States lands or rights-of-way.You may leave in place <br /> frame. the United States,but yo 11 remain liable for the cost of removing <br /> it and restoring the site. N <br /> Sec. 8.Bonds-(a)You must furnish BLM with a bond in the amount �rJ a�' <br /> of$ Existing Bond as a condition of issuing this contract. Sec. 17.Equal opportunity clan ee ns you take in hiring <br /> must comply with the provisions of Exe ive Order No. 11246 of <br /> (b)If you do not perform all terms of the contract,BLM will Sept.24, 1965,as ed,which describe the non-discrimination <br /> deduct an amount equal to the damages from the face amount of the clauses.Your ge �py of this order-from BLM. <br /> the excess.isi ivi win cancei uie vonu or return the casn ui U.a.vuiius rr t r <br /> you supplied when you have completed performance under this <br /> contract. l <br /> (c)BLM will require a new bond when it finds any bond you <br /> furnish under this contract to be unsatisfactory. <br /> (Continued on page 3) (Form 3600-9,page 2) <br />
The URL can be used to link to this page
Your browser does not support the video tag.