Laserfiche WebLink
b4 <br /> V HART ENVIRONMENTAL <br /> PO. Box 4303 Boulder, Coloraalo 80306 Aotte• 303.444 6602 RECEIVED <br /> SEP G2 2016 <br /> DIMON OF RECLAMATIONTR06 MINING FTY <br /> ed✓1 rioladon: MV1995032 August 31, 2016 <br /> Mr. Tyler O'Donnell <br /> Division of Reclamation, Mining and Safety <br /> Department of Natural Resources <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> Re: DRMS Permit No. M-1987-049, Bromley Lakes Notice to Import Inert Material <br /> and Technical Revision JR) for Phase 18, Revised Reclamation Plan. <br /> Dear Tyler: <br /> Pursuant to the requirements of Rule 3.1.5(9), please accept this letter and the enclosed <br /> Affidavit and Reclamation Plan(Exhibit F) as Ready Mixed Concrete Company's (RMCC's) <br /> "Notice"to import inert fill into Phase 18 of the Bromley Lakes Pit, DRMS Permit No. M-1987- <br /> 049 and the related request for a Technical Revision to the permit related thereto. RMCC <br /> intends to accept inert fill generated from activities the City of Brighton has initiated to clean <br /> out its municipal water storage reservoir(known as Cell No.1). The inert fill will be used to <br /> augment reclamation backfill generated from return concrete from RMCC's Ready Mixed <br /> Concrete plant operations adjacent to the Bromley Lakes Pit permit area. The following <br /> information is submitted to the Division of Reclamation, Mining and Safety in accordance with <br /> the requirements of Rule 3.1.5(9). <br /> Also Enclosed please find the fee for the above referenced Technical Revision in the form <br /> of a check(#5133) in the amount of$216.00. <br /> RULE 3.1.5(9) <br /> (a) A narrative that describes the approximate location of the proposed activity; <br /> Response: <br /> Backfill is limited to approximately 7 acres of mining in Phase 18, the former sand and gravel <br /> plant site and stockpile area. RMCC wishes to change the reclamation plan for Phase 18 from <br /> "Open Water" to "Backfilled Upland Wildlife Habitat"as depicted on the revised Reclamation <br /> Plan (see enclosed Exhibit "F'). <br /> Wetlands Banking <br /> Enmromnental Alamagenrent <br /> Land Use Planning <br /> Reclamation Design <br /> Peanuttrnq&Zonmg <br />