My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-11_REVISION - C1992081 (8)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1992081
>
2016-08-11_REVISION - C1992081 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 11:16:47 AM
Creation date
9/6/2016 7:26:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Revision
Doc Date
8/11/2016
Doc Name
Review (Memo)
From
Janet Binns
To
Leigh Simmons
Type & Sequence
TR11
Email Name
LDS
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/6/2016 <br />State.co.us Executive Branch Mail - Re: Hayden Gulch Load Out TR11 <br />Janet, <br />My review memo for TR -11 is attached. <br />Leighn <br />Environmental Protection S <br />A&VCOLORADO <br />Division. of lRectarn.atfon, <br />b4ftihng° avid Safety <br />[)upr,Ornent or Natural Rertources, <br />On Thu, Aug 11, 2016 at 1:34 PM, Binns - DNR, Janet <janet.binns@state.co.us> wrote: <br />Hello Leigh and Rob, <br />Hayden Gulch Terminal, LLC has submitted a technical revision, TR11, requesting a reduction in frequency and a <br />reduction in analytical parameters for surface and groundwater monitoring for the Hayden Gulch load out. The load out <br />is mostly reclaimed, and has been since 2013. The operator is currently removing the rail line, ties and ballast. They <br />have not backfilled and regraded the rail loop cut and fill areas yet. The Tie -across haul road is anticipated to remain <br />as a permanent road. The operator is currently working with Routt County to be able to permit the haul road as a <br />permanent structure. The operation potentially is 5 to 7 years away from final bond release. <br />Rob, please review the proposed changes to the surface water monitoring plan. <br />Leigh, please review the proposed changes to the ground water monitoring plan. <br />I determined that the application was complete today, 8/11/2016. Please provide me any comments by 9/7/2016 so I <br />can get the adequacy letter out to the operator in the regulatory time frame. <br />Thank you for your assistance. I will put the proposed revised pages in your inboxes. (no electronic file) <br />Janet Binns <br />Environmental Protection Specialist III <br />Coal Regulatory Program <br />COLORADO <br />1 ivisi.oni of'Reclamation,, <br />Mi n.j.rz and Safe't'y <br />f )q)ahrncnt or Nalur,' l Resources <br />es <br />P 303.866.3567 ext 8107 F 303.832.8106 <br />1313 Sherman St., Room 215, Denver, CO 80203 <br />janet.binns state.co.us httpd//mining.state.co.us <br />https://m ai I . googl e. com/m ai I/u/0/?ui =2&i k= e29129fcb5&view= pt&search= i nbox&th=156ec 118325816d6&si m I=156ec118325816d6 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.