My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-01_REVISION - C1980007
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980007
>
2016-09-01_REVISION - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 11:11:03 AM
Creation date
9/2/2016 10:44:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
9/1/2016
Doc Name
Application
From
Mountain Coal Company
To
DRMS
Type & Sequence
MR418
Email Name
LDS
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mountain Coal Company <br />August 26, 2016 <br />Mountain Coal Company, LLC <br />West Elk Mine <br />5174 Highway 133 <br />Somerset, CO 81434 <br />Jessica A. Wilczek, P.E. <br />Environmental Engineer <br />iloveland(cDarchcoal. com <br />phone: 970 929 2308 <br />RECEIVE® <br />Mr. Leigh Simmons <br />Colorado Department of Natural Resources SEP 01 2016 <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 DWON OF RECLAMATION <br />Denver, CO 80203 MINING AND SAFETY <br />Re: Mountain Coal Company, LLC, West Elk Mine; <br />Permit No. C-1980-007, Minor Revision No. MR -418, Rerouted MSB Drainage <br />Dear Mr. Simmons: <br />Mountain Coal Company, LLC (MCC) submits this letter, application form, maps and supporting calculations <br />for Minor Revision No. MR -418. The purpose of this revision is to provide documentation that the existing <br />ditches and culverts are sufficient to carry the rerouted stormwater flows. The attached map shows the former <br />flow path and the new flow path that now carries flows from the Materials Storage Bench (MSB), around the <br />LRP and to Pond MB -5E. The former path was through a longer culvert (that was damaged by heavy wet <br />snows causing leaks earlier this year) and through culvert C5E-24 to ditch D5E-6, that also flowed to Pond MB - <br />5E. As shown on the attached calculation sheets, the maximum designed flows in each of the ditches and <br />culverts downstream of culvert C5E-25 are large enough to also carry the flows added from the MSB. Copies <br />of the existing approved ditch and culvert designs from Exhibit 66 are also provided for your convenience. <br />Please contact me at (970) 929-2308 or by e-mail should you have questions regarding this submittal. <br />Sincerely, <br />Jessica A. Wilczek, P.E. <br />Env' ental -Engineeer <br />cc: eston Norris — MCC <br />Neal Starkebaum — Gunnison Co. <br />
The URL can be used to link to this page
Your browser does not support the video tag.