Laserfiche WebLink
TRAPPER MINIM INC. <br />January 25, 2016 <br />Mr. Russell Riley <br />District Manager <br />CMS&H District 9 <br />P.O. Box 25367 DFC <br />Denver, CO 80225-0367 <br />Re: Ground Control Plan for Trapper Mine: MSHA I.D. 05-02838 <br />Dear Mr. Riley: <br />7:Y1s e1 <br />RECEIVED <br />JAN 2 5 201.6 <br />1J$00L-MSHA CMS&H <br />District; 9 <br />In accordance with 30 CFR Part 77.1000-1, Trapper Mining Inc. is filing a revised version of the Ground <br />Control Plan for Trapper Mine. This plan provides appropriate updates given that mining in the 2006 <br />landslide material and construction of the Horse Gulch excess spoil fill are nearly complete. <br />The enclosed plan is comprised of eight (8) pages of text including one table (Major Equipment List), one <br />(1) figure (Fig 1. Stratigraphic Section), three (3) cross-section drawings (Cross Sections 1, 2, and 3), and <br />a Ground Control Plan Map. <br />A copy of this plan has been made available to Mr. Dave Owens, Miner's Representative at Trapper. A <br />copy of the document acknowledging his receipt of the plan is enclosed for your reference. Please contact <br />me at 970-826-6122 if you have any questions or require any further information. Thank you for your <br />cooperation. <br />Sincerely, <br />Karl C. Koehler <br />Safety Manager, Trapper Mining Inc. <br />cc: Mincrs Representative (w/ enc) <br />Steve Hinkemeyer (w/ enc) <br />Jim Mattern (w/ enc) <br />FILE (w/ enc) <br />ACCEPTED/FILED <br />AUG 2 6 2016 <br />CMSH-DISTRic-I" 9 <br />S:\GROUND CONTROLVanuary 2016 GCP Revision\ground control cvrltr (01_25_16).doex <br />F0. Box 187 Craig, Colorado 81626 (970) 824-4401 <br />