Zach Trujillo <br />Page 2 <br />September 1, 2016 <br />I concur with the operator that GW -5 and GW -6 no longer provide information of any value <br />and can be removed from the monitoring program and abandoned, however there are several <br />adequacy issues to address before TR -27 can be approved: <br />In the proposed revised page, the 6th paragraph, beginning "On March 20..." has been <br />changed to refer to GW -5 when previously it referred to GW -6. <br />Please explain the reason behind the change to the text of the 6' paragaraph. <br />Rule 4.07.3 gives performance standards for the permanent sealing of all underground <br />openings, including wells. Specifically, 4.07.3(3) requires that a plugging and <br />abandonment report should be submitted to the Division within 60 days of <br />abandoning a drill hole. Such reports are not readily available in the PAP for GW -2, -4, - <br />7 and -8. <br />Please provide plugging and abandonment reports for GW -2, -4, -7 and -8. They <br />should be added to the PAP as a new appendix, and referred to in the text of section <br />2.6. <br />Following the approval of TR -27, GW -5 and GW -6 should be plugged and abandoned in <br />accordance with 4.07.3. Plugging and abandonment reports for the two wells should <br />be submitted to the Division within 60 days, and added to the PAP with a new Minor <br />Revision. <br />