Laserfiche WebLink
Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Haul Route: <br />Page 5 of 138 <br />Road Condition: Firm, smooth, rolline, dirt/It. surfaced, watered, <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />rave <br />0.572 <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />LCY/Hour Adjusted forjob efficiency: <br />673.46 LCY/Hour <br />TruckUnit Production <br />min <br />1 <br />950.00 <br />-5.00 <br />3.00 <br />-2.00 <br />3893 <br />0.294 <br />Haul Time: 0.294 minutes <br />Return Route: <br />Seg # HaulDistance Grade (%) Roll. Res Total Res Velocity <br />Trave <br />(Ft) (%) (%) (fpm) <br />Time <br />min <br />1 950.00 5.00 3.00 8.00 2120 <br />0.572 <br />CIRCES Cost Estimating So$ware <br />Return Time: 0.572 <br />minutes <br />Total Truck Cycle Time: 4.111 <br />minutes <br />Loading Tool unit <br />Production <br />811.40 <br />LCY/Hour Adjusted forjob efficiency: <br />673.46 LCY/Hour <br />TruckUnit Production <br />443.10 <br />LCY/Hour Adjusted forjob efficiency: <br />367.78 LCY/Hour <br />Optimal No. ofTrucks: <br />2 <br />Truck(s) Selected NumberofTrucks: <br />2 Truck(s) <br />Adjustedhourly truck teamproduction: 735.55 <br />LCY/Hour <br />Adjusted single trucMoader teamproduction: 673.46 <br />LCY/Hour <br />Adjusted multiple truck/loaderteamproduction: 1,346.93 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />2 <br />Team(s) Totaljobtime: 243.07 <br />Hours <br />Unit cost: <br />$1.169 <br />/LCY Totaljob cost: $382,729 <br />CIRCES Cost Estimating So$ware <br />