My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-31_REVISION - C2009087 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2016-08-31_REVISION - C2009087 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 9:23:35 AM
Creation date
9/2/2016 8:53:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
8/31/2016
Doc Name
Reclamation Cost Update
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
RN1
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Description: Clay and gravel -Dry <br />Rated Payload: 82,000 Pounds <br />Payload Capacity: 34.17 LCY <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />21.60 <br />LEY <br />Heaped Volume: <br />31.70 <br />LEY <br />Average Volume: <br />26.65 <br />LEY <br />Adjusted Volume: <br />31.70 <br />LEY <br />Final Truck Volume Based on Number ofLoader Passes: <br />Loading Tool Capacity <br />Rated Capacity: 9.200 <br />Bucket Fill Factor: 1.100 <br />Adjusted Capacity: 10.120 <br />Job Condition Corrections: <br />Page 41 of 138 <br />30.36 LCY <br />Bucket Size Class: NA <br />LCY (heaped) <br />Other-rock/dirtmi�dures (100-120%) 1.1 <br />LCY <br />Site Altitude (ft.): 6800 feet <br />Job Efficiencv: 1 0.830 1 0.830 1 (CAT HB) <br />Net Correction: 1 0.830 <br />Loading Tool Cycle Time: Number of Loading ToolPasses Required to Fill 3 passes <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders —Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheeland Track Loaders -Unadjusted Basic Loader Cycle Time (load, dump, 0.575 mnutes <br />maneuver): <br />Cycle Time Factors <br />0.600 <br />Factor (min.) <br />Source <br />Material: <br />Material 1/8" to 3/4" diameter -0.02 <br />-0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor ordozerpiled 10 ft. high and up <br />0.000 <br />(Cat HB) <br />0.00 <br />Truck Ownership: <br />Common ownership oftrucks and loaders - <br />-0.040 <br />(Cat HB) <br />0.04 <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Net Cycle lune Adjustment: -U. l UU mmutes <br />AdjustedLoader Cycle Time: 0.475 minutes <br />Net Load Time per Truck: 1.050 minutes <br />Truck Cvcle Time: <br />TruckFxchange Time: 0.60 Minutes <br />Truck Load Time: 1.050 Minutes <br />Truck Maneuver and Dump 1.00 Minutes <br />Time: <br />Adjustedfor site altitude: <br />0.600 <br />Minutes <br />Adjusted for site altitude: <br />1.050 <br />Minutes <br />Adjusted for site altitude: <br />1.000 <br />Minutes <br />CIRCES Cost Estimating So$ware <br />
The URL can be used to link to this page
Your browser does not support the video tag.