My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-31_REVISION - C2009087 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2016-08-31_REVISION - C2009087 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 9:23:35 AM
Creation date
9/2/2016 8:53:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
8/31/2016
Doc Name
Reclamation Cost Update
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
RN1
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 28 of 138 <br />Haul Route - <br />Seg # Haul Distance <br />Grade (%) <br />Roll. Res TotalRes Velocity Trave <br />(Ft) <br />Velocity <br />(fpm) <br />(%) (%) (fPm) Time <br />1 <br />10560.00 <br />(min) <br />1 10560.00 <br />0.00 <br />1.20 1.20 4223 3.212 <br />Haul Time: 3.212 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />N <br />TotalRes <br />(%) <br />Velocity <br />(fpm) <br />rave <br />Time <br />(min) <br />1 <br />10560.00 <br />0.00 1.20 <br />1.20 <br />4254 <br />2.754 <br />Return Time: 2.754 minutes <br />Total Truck Cycle Time: 8.616 minutes <br />Loading Toolunit <br />Production 1,104.00 LCY/Hour Adjustedforjob efficiency: 916.32 LCY/Hour <br />Truck Unit Production <br />Optimal No. ofTrucks <br />1.42 LCY/Hour Adjustedforjob efficiency: 175.48 L-Y/Hour <br />5 Truck(s) Selected NumberofTrucks: 6 Truck(s) <br />Adjustedhourly truck teamproduction: 1,052.87 LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 916.32 LCY/Hour <br />Adjusted multiple truck/loaderteamproduction: 916.32 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $1.626 /LCY <br />Totaljob time: 4.99 Hours <br />Totaljob cost: $7,436 <br />CIRCES Cost Estimating So$ware <br />
The URL can be used to link to this page
Your browser does not support the video tag.