My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-31_REVISION - C2009087 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2016-08-31_REVISION - C2009087 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 9:23:35 AM
Creation date
9/2/2016 8:53:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
8/31/2016
Doc Name
Reclamation Cost Update
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
RN1
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 25 of 138 <br />TRUCK/LOADER TEAM WORK <br />Task description: Remove Gravel from North Facilities Parking Area <br />Site: Peabody Sage Creek Mne Permit Action: RN1-2015 Permit/Job#: C2009087 <br />PROJECT IDENTIFICATION <br />Task#: 020 <br />Date: 8/31/2016 <br />1:08:19 PM <br />State: Colorado <br />County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />IrUCKLoaaerleam-1rUcx: kat IIUD <br />-Loader: CAT 9881 <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: 1 W ater Tai <br />Cost Breakdown: Truck/LoaderTeam <br />Abbreviation: None <br />Filename: C087-020 <br />Shift basis: I per day <br />Des <br />Support Eauipment Maintenance Eauioment <br />Total work team cost/hour: $1,490.20 <br />MATERIAL OUANTITIES <br />Initial volume: 4,195 CCY Swell factor: 1.090 <br />Loose volume: 4,573 LCY <br />Source of es timated volume: Division ofReclamation, Mining & Safety <br />Source of estimatedswell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Pa, load weight, Basis: <br />Material weight: 2,400 Pounds/LCY <br />CIRCES Cost Estimating So$ware <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />WaterTruck <br />%Utilization -machine: <br />100 <br />95 <br />NA <br />NA <br />25 <br />25 <br />Ownership cost/hour: <br />$83.44 <br />$86.92 <br />NA <br />NA <br />$53.53 <br />$59.07 <br />Operating cost/hour: <br />$69.85 <br />$94.05 <br />NA <br />NA <br />$14.18 <br />$26.27 <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripperown. <br />cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$22.10 <br />$38.60 <br />NA <br />NA <br />$35.83 <br />$29.42 <br />Unit Subtotals: <br />$175.39 <br />$219.57 <br />NA <br />NA <br />$103.54 <br />$114.75 <br />NumberofUnits: 1 <br />6 <br />1 <br />0 <br />1 0 1 <br />1 1 <br />1 <br />Group Subtotals: I <br />Work: <br />$1,271.91 <br />Support: <br />$0.00 1 <br />Maint: <br />$218.29 <br />Total work team cost/hour: $1,490.20 <br />MATERIAL OUANTITIES <br />Initial volume: 4,195 CCY Swell factor: 1.090 <br />Loose volume: 4,573 LCY <br />Source of es timated volume: Division ofReclamation, Mining & Safety <br />Source of estimatedswell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity <br />Truck Pa, load weight, Basis: <br />Material weight: 2,400 Pounds/LCY <br />CIRCES Cost Estimating So$ware <br />
The URL can be used to link to this page
Your browser does not support the video tag.