Laserfiche WebLink
Page 23 of 138 <br />BULLDOZER WORK <br />Task description: Regrade Drill Pads CCU087 and Septic Drain field <br />Site: Peabody Sage Creek Mine Perinit Action: RN1-2015 Permit/Job#: C2009087 <br />PROJECT IDENTIFICATION <br />Task#: 013 <br />Date: 8/31/2016 <br />1:07:07 PM <br />User: JLE <br />State: Colorado <br />County: Routt <br />Agency or organization name <br />111 IR♦ <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3-s h ank ripp er <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripperop. Cost/Hour: <br />Operator Cost/flour: <br />Abbreviation: None <br />Filename: C087-013 <br />$82.01 <br />Utilization % <br />NA <br />$79.23 <br />100 <br />$8.40 <br />NA <br />$5.62 <br />100 <br />$38.89 <br />NA <br />Total unitCost/Hour: $214.15 <br />Total Fleet Cost/Hour: $214.15 <br />MATERIAL QUANTITIES <br />Initial Volume: 847 <br />Swell factor: 1.250 <br />Loose volume: 1,059 LCY <br />Source ofestimatedvolume: Division ofReclamation, Mining & Safety <br />Source ofestimatedswell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />Averagepush <br />gradient: <br />Averages ite altitude: <br />Materialweight <br />50 feet <br />1,400.0 LCY/hr <br />Compacted fill or embankment 0.9 <br />0% <br />6,800 feet <br />2,650 lbs/LCY <br />CIRCES Cost Estimating Solware <br />