Laserfiche WebLink
Page 13 of 138 <br />Haul Route - <br />Seg # Haul Distance <br />Grade (%) <br />Roll. Res TotalRes Velocity Trave <br />(Ft) <br />TotalRes <br />(%) <br />(%) (%) (fPm) Time <br />rave <br />Time <br />(min) <br />(min) <br />1 1250.00 <br />-1.00 <br />3.00 2.00 1 3843 1.131 <br />Haul Time: 1.131 minutes <br />Return Route: <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Unit cost: $1.590 /LCY <br />Totaljob time <br />Totaljob cost <br />182.31 Hours <br />$345,239 <br />CIRCES Cost Estimating So$ware <br />Seg # <br />Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />N <br />TotalRes <br />(%) <br />Velocity <br />(fpm) <br />rave <br />Time <br />(min) <br />1 <br />1250.00 <br />1.00 3.00 <br />4.00 <br />3891 <br />0.703 <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Unit cost: $1.590 /LCY <br />Totaljob time <br />Totaljob cost <br />182.31 Hours <br />$345,239 <br />CIRCES Cost Estimating So$ware <br />Return Time: 0.703 <br />minutes <br />Total Truck Cycle Time: 5.079 <br />minutes <br />Loading Toolunit <br />Production <br />811.40 LCY/Hour Adjustedforjob efficiency: <br />673.46 LCY/Hour <br />Truck Unit Production <br />358.65 LCY/Hour Adjusted forjob efficiency: <br />297.68 LCY/Hour <br />Optimal No. ofTrucks: <br />2 Truck(s) Selected NumberofTrucks: <br />2 Truck(s) <br />Adjustedhourly truck teamproduction: 595.36 <br />LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 595.36 <br />LCY/Hour <br />Adjusted multiple truck/loaderteamproduction: 1,190.73 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Unit cost: $1.590 /LCY <br />Totaljob time <br />Totaljob cost <br />182.31 Hours <br />$345,239 <br />CIRCES Cost Estimating So$ware <br />