Laserfiche WebLink
Description: Decomposed rock -25% Rock, 75% Earth <br />Rated Payload: 82,000 Pounds <br />Payload Capacity: 30.94 LCY <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />21.60 <br />LCY <br />Heaped Volume: <br />31.70 <br />LCY <br />Average Volume: <br />26.65 <br />LCY <br />Adjusted Volume: <br />30.94 <br />LCY <br />Final Truck Volume Based on Number ofLoaderPasses: <br />Loading ToolCapacitX <br />Rated Capacity: <br />Bucket Fill Factor: <br />Adjusted Capacity: <br />Job Condition Corrections: <br />Page 11 of 138 <br />30.36 LCY <br />Bucket Size Class: NA <br />9.200 LCY (heaped) <br />0.825 Blasted rock -avg. blasted (75 - 90%) 0.825 <br />7.590 LCY <br />Site Altitude (ft.): 6800 feet <br />Net Correction: I 0.830 I 0.830 <br />Loading Tool Cycle Time: Number of Loading ToolPasses Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders —Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: <br />Wheeland TrackLoaders -Unadjusted Basic Loader Cycle Time (load, dump, <br />maneuver): <br />4 passes <br />0.575 minutes <br />Cycle Time Factors <br />Truck Loader <br />Source <br />Altitude Ad': <br />1.000 1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 0.830 <br />(CAT HB) <br />Net Correction: I 0.830 I 0.830 <br />Loading Tool Cycle Time: Number of Loading ToolPasses Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders —Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: <br />Wheeland TrackLoaders -Unadjusted Basic Loader Cycle Time (load, dump, <br />maneuver): <br />4 passes <br />0.575 minutes <br />Cycle Time Factors <br />Factor (min.) <br />Source <br />Material: <br />Mixed material 0.02 <br />0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor ordozerpiled 10 ft. high and up <br />0.000 <br />(Cat HB) <br />0.00 <br />Truck Ownership: <br />Common ownership oftrucks and loaders - <br />-0.040 <br />(Cat HB) <br />0.04 <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Net C Acle lune Adjustment: -U.UbU minutes <br />AdjustedLoader Cycle Time: 0.515 minutes <br />Net Load Time per Truck: 1.645 minutes <br />Truck Cycle Time: <br />TruckExchange Time: 0.60 Minutes Adjustedfor site altitude: 0.600 Minutes <br />Truck Load Time: 1.645 Minutes Adjusted for site altitude: 1.645 Minutes <br />CIRCES Cost Estimating So$ware <br />