Laserfiche WebLink
Page 9 of 138 <br />Haul Route - <br />Seg # Haul Distance <br />Grade (%) <br />Roll. Res TotalRes Velocity Trave <br />(Ft) <br />rave <br />Time <br />(min) <br />0.466 <br />(%) (%) (fPm) Time <br />Total Truck Cycle Time: 4.343 <br />minutes <br />(min) <br />1 500.00 <br />0.00 <br />3.00 3.00 1 2754 0.632 <br />Haul Time: 0.632 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />1 500.00 <br />Grade (%) Roll. Res <br />N <br />TotalRes <br />(%) <br />3.00 <br />Velocity <br />(fpm) <br />4074 <br />rave <br />Time <br />(min) <br />0.466 <br />0.00 3.00 <br />Total Truck Cycle Time: 4.343 <br />CIRCES Cost Estimating So$ware <br />Return Time: 0.466 <br />minutes <br />Total Truck Cycle Time: 4.343 <br />minutes <br />Loading Toolunit <br />Production <br />811.40 <br />LCY/Hour Adjustedforjob efficiency: <br />673.46 LCY/Hour <br />Truck Unit Production <br />419.43 <br />LCY/Hour Adjusted forjob efficiency: <br />348.13 LCY/Hour <br />Optimal No. ofTrucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjustedhourly truck teamproduction: 696.26 <br />LCY/Hour <br />Adjustedsingletruck/loaderteamproduction: 673.46 <br />LEY/Hour <br />Adjusted multiple truck/loaderteamproduction: 2,020.39 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />3 <br />Team(s) Totaljob time: 102.12 <br />Hours <br />Unit cost: <br />$1.062 <br />/LCY Totaljob cost: $219,030 <br />CIRCES Cost Estimating So$ware <br />