Laserfiche WebLink
R <br /> 20' 20' 20' 20' 20` <br /> xistirtc� Grtt�t� <br /> El. = 80' <br /> Daily Inspections of the wall are necessary and any <br /> cause for concern should be brought to the attention <br /> of the Engineer. <br /> Phase 3 Bench <br /> During reclamation,start filling the bottom portion, Reclaimed 1:1 <br /> up to the bench. Slope i fi �i--- i1-_ El. - 4E)' <br /> - - �- Mining lines <br /> L;t_y <br /> El. = 100' <br /> Highwall @ Helmericks <br /> Phase 3 <br />