Laserfiche WebLink
August 25, 2016 C-1981-028/Keenesburg Strip Mine RAR <br />Photo 4: Water level in Pitt B. <br />TOPSOIL - Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4), Storage and Protection 4.06.3, <br />Redistribution 4.06.4: <br />Erosional features on the top sand piles observed last month appeared stable. These features <br />should be monitored and stabilized if necessary. Overall top sand piles appeared shaped to <br />a stable grade. Having been seeded in autumn of 2016 short term cover was establishing and <br />stabilizing the material from excess erosion. No areas are slated for topsand application untill <br />2018 or so, as sufficient overburden (six feet) must be placed in advance of topsanding. <br />Overburden placement is progressing from south to north toward the B Pit. <br />Photo 5: Current area of overburden placement. <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 1 <br />Page 5 of 9 <br />