Laserfiche WebLink
Oak #1 W Spillway has been cleaned <br />Oak #2 W Spillway has been cleaned <br /> <br /> <br /> <br />Cleaned out spillway at Oak Pond #2 Grouse #1 embankment maintenance have been completed <br /> to address erosion along fence line. <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br /> The ash disposal area was observed and no problems were noted. Queen Anne was idle. The Baby Doe <br />was down for annual maintenance. Molly Brown was active at the top of L-pit. Topsoil stripping and development <br />drill holes were observed northeast of the active pit. <br /> <br />Molly Brown in L-pit <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br /> Road watering was occurring at the time of inspection. A new haul road is currently being constructed. <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> New topsoil had been placed on Z-pit reclaim and on K parcels. Topsoil stripping has occurred in the <br />northeast area of the mine as approved in TR115.