My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-29_INSPECTION - C1981012
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981012
>
2016-08-29_INSPECTION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 6:50:55 AM
Creation date
8/29/2016 1:07:11 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Inspection
Doc Date
8/29/2016
Doc Name
Inspection Report
From
DRMS
To
New Elk Coal Company, LLC
Inspection Date
8/17/2016
Email Name
RAR
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 17, 2016 C-1981-012/New Elk Mine RAR <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 0 <br /> <br /> Page 5 of 10 <br /> <br />exist on site. Treatment of these features includes filling gullies with branches and instal ling straw bales or <br />wattles. Also, some sediment traps required maintenance. These items are on the operator’s maintenance list for <br />dispatching as soon as possible. Silt fences having been recently repaired appeared to function adequately, photo s <br />4A and 4B. <br />The slurry injection system is currently not in use. However, recent discussion with DRMS for mitigating <br />excessive pond volumes may authorize the utilization of this system to reduce water volumes in Ponds 7 and 8. <br />Pond 8 had a flowmeter attached to its discharge mechanism in May 2016. The meter is scheduled for calibration. <br />The calibration process involves pumping for 5 days at the rate of 1000 gallons per minute, (GPM). Considerable <br />discharged from pond 8 occurred the week of 8 August 2016 causing such a tall and forceful plume of water <br />flowing from the pipe that the concrete casing was placed over the pipe opening to contain the plume. Also, <br />additional rock armoring and berming were added to prevent erosion of the channel to the concrete spillway. <br />Discussion of the gully forming at the belt portal (photo 8B, maintenance item #4) included constructing a sump <br />above, berming the area and armoring the gully. This work was thought to be able to begin within a month to <br />month and a half. <br /> <br /> <br /> Photo 4A: Reworked silt fence BMP at the water tank and <br />associated wattle structure (photo 4B). <br /> <br /> <br />Photo 5: Newly installed discharge apparatus consisting of <br />flowmeter at pond 8. <br /> <br /> <br /> <br />Photo 4B: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.