Laserfiche WebLink
Peabody Sage Creek Mining, LLC <br />Page 7 <br />8/25/2016 <br />Mercury monitoring is no longer required for PSCM's <br />outfalls. <br />10. Interim Narrative <br />CWQCC regulation 41 <br />It was determined that bedrock groundwater points of <br />Standard for Ground <br />compliance are unwarranted at the PSCM mine. Well <br />Water <br />SGAL70 serves as the PSCM Grassy Creek Alluvial <br />groundwater point of compliance. This wells was <br />approved to be the groundwater point of compliance well <br />for the original Seneca 11 mine (see TR -47 and <br />Attachment 7-3 of the C-1980-005 permit for details). <br />Table 7 of the AHR provides the Ground Water Point of <br />Compliance Standards for the SGAL70 Alluvial Well. <br />Upon review of the 2015 data for SGAL70, none of the <br />standards from Table 7 were exceeded with the exception <br />of Cadmium. On September 8, 2015 the Cadmium level <br />was reported to be <10 ug/1. The Table 7 standard for <br />Cadmium is 5 ug/l. The Reg. 41 standard to Cadmium is <br />10 ug/l. Given this, it appears the level reported for <br />Cadmium at well SGAL70 is below the CWQCC <br />Regulation 41 standard. <br />11. Sampling frequency <br />Volume 1, p. 2.04-107 <br />All required sampling frequencies were met with the <br />at surface water <br />of CDRMS mining <br />exception noted below: <br />permit C-2009-087 <br />• SSPG6 was not monitored as required. PSCM <br />indicates this spring was final bond released and <br />therefore did not need to be sampled. This spoil <br />spring has not been bond released and will <br />need to continue to be sampled. The Division <br />is currently reviewing Technical Revision No. 9 <br />for the PSCM which is modifying the currently <br />approved monitoring plan. <br />• SSPG7 was not monitored. According to the <br />PSCM 2015 AHR, this spring no longer exists. <br />The Division is currently reviewing Technical <br />Revision No. 9 for the PSCM which is modifying <br />the currently approved monitoring plan. <br />12. Parameters to be <br />Volume 1, p. 2.04-108 <br />All required parameters were analyzed with the exception <br />sampled at surface <br />of CDRMS mining <br />noted below: <br />water sites <br />permit C-2009-087 <br />