Laserfiche WebLink
W S I Weiland, Inc. <br /> Environmental£t Engineering <br /> August, 24 2016 RECEIVE® <br /> Environmental Support for: <br /> AUG 2 4 2016 • Transportation <br /> DIVISION OF RECLAMATION Land Development <br /> MINING AND SAFETY <br /> Michael Cunningham • Mining <br /> Environmental protection Specialist 0 Industry <br /> Colorado Division of Mining Reclamation & Safety <br /> 1313 Sherman St., Room 215 <br /> Denver, Colorado 80202 <br /> Re: Goose Haven Reservoir#2 M-2010-071 Amendment Application (AM01) <br /> Decision Date Extension Request <br /> Michael, <br /> As of today's date, one year has passed since the above referenced application was <br /> submitted. It is understood that after one year following the date of application, the <br /> Division is required to approve or deny said application. Changes to the project <br /> involving re-grading of Cell 2 and the location and details of the interconnect <br /> pipeline between the existing Reservoir#3 and Cell 2 as well as finalizing a pipeline <br /> crossing and mining setback agreement with Northern Colorado Water <br /> Conservancy district have prevented us from completing the adequacy review <br /> response required for the Division to make a decision. <br /> We hereby ask that the Mined Land Reclamation Board hear the matter of extending <br /> the decision date for M-2010-071 AM01. <br /> pm,,,�, w qnN"--J <br /> Peter Wayland <br /> President <br /> PC Box 18087. BOULDER, CO 80308 <br /> ph 3173-443-95BI <br />