My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-22_HYDROLOGY - M1983194
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1983194
>
2016-08-22_HYDROLOGY - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2020 8:29:45 AM
Creation date
8/25/2016 10:03:22 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
HYDROLOGY
Doc Date
8/22/2016
Doc Name
Well Completion Form
From
Daub & Associates
To
DRMS
Email Name
THM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1985 Ys SOUTH BROADWAY <br /> GRAND JUNCTION,CO 81507-9649 <br /> DAUB & ASSOCIATES, INC. ' (970)254-1224 <br /> FAX(970)242-8438 <br /> email: gjdaub@daubandassociates.com <br /> www.daubandassociates.com <br /> August 18, 2016 ^� RECE"D <br /> Mr. Kent Walter AUG, ' <br /> Bureau of Land Management AUG' �2Q)Q <br /> 220 East Market Street <br /> Meeker, CO 81641 <br /> Re: Natural Soda LLC (NS)Well Completion Report and Data for Injection Well 15H-1 <br /> Dear Mr. Walter: <br /> NS drilled and completed the 151-1-1 injection well. The well was drilled and completed as planned <br /> and permitted except for the lateral interval. Circulation losses forced NS to plug back the original <br /> lateral path and sidetrack the well to approximately 200 feet south of the proposed path. The <br /> lateral path of the well now occupies the proposed 161-1-1 lateral well path. <br /> Attached is the Well Summary Report containing: <br /> • a completed 3160-4 form <br /> • Completion Diagrams <br /> o A thin line as built completion diagram of the 151-1-1 ST <br /> o A schematic completion diagram of the 151-1-1 ST <br /> o A plan view of the 151-1-1 ST <br /> o A schematic drawing of the well showing the original 151-1-1 plugged back <br /> path <br /> • Well completion data (Capstar DDLs, SDI directional data, Halliburton Cement <br /> Report) <br /> • D&A cement evaluation and EPA MIT Part I documents <br /> • geophysical logs(gamma/density/caliper, CBL/CCL) <br /> Also included is the letter to Wendy Cheung and a copy of the EPA form 7520-9 submitted in the <br /> Data Submission for Injection Approval package. The 15H-SSMW and 15H-SSM data is not <br /> included as you have already received them. <br /> Should you have any questions or comments, please contact me at (970)254-1224 or (970) 216- <br /> 1010(c), or Kirk Daehling at(888)464-7632 ext. 114. <br /> Regards, <br /> Gerald J.'Daub, P.G., C.P.G. <br /> President <br /> Daub&Associates, Inc. <br /> Cc: Kirk Daehling <br /> Plant Manager, Natural Soda LLC <br /> Travis Marshall w/o encl. <br /> CO DRMS <br /> SPECIALIZING IN PROFESSIONAL GEOLOGICAL,ENVIRONMENTAL, HYDROLOGICAL,GEOTECHNICAL AND PERMITTING SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.