Laserfiche WebLink
YES NO N/A <br />1 x <br />2 <br />3 x <br />4 x <br />5 <br />x <br />x <br />x <br />x <br />x <br />x <br />7 x <br />8 x <br />9 x <br />10 x <br />11 x <br />12 x <br />13 x <br />14 <br />15 <br />16 x <br />17 x <br />x <br />x <br />x <br />x <br />x <br />20 x <br />21 <br />PERIODIC INSPECTION FORM:  Water, Sediment, or Slurry Impoundments <br />INSPECTOR'S NAME:   Chris Miller         DATE: 05/03/16 <br />NPDES I.D. NO.:   CO‐0048275 D.P. 004     <br />FACILITY CONFIGURATION: Diked Pond DATE LAST INSPECTION:  03/03/16 <br />Angle of slope:   5:1    upstream,      2:1    downstream Total =  7:1 <br />SITE NAME: South Section 12 Pond #004   LOCATION: SW¼ SE¼, Sec. 12, T5N, R87W <br />MINE NAME: Peabody Sage Creek Mine  LOCATION: 7.1 mi. SE of Hayden, CO   <br />MINE I.D. NO.: CMLRD Permit No. C‐2009‐087  OWNER'S REP.: Brian Watterson    <br />CIRCLE OR WRITE IN APPROPRIATE RESPONSE: <br />Foundation preparation (removal of vegetation, stumps, topsoil: <br />Lift thickness = 12 inches <br />Compaction according to approved plan: <br />Burning (specify extent and location): <br />*Erosion of toe: <br />6 *Seepage (specify location, color, and approximate volume) <br />From underdrain pipes‐ all water coming out of old underdreain pipe <br />At isolated points on embanckement slopes <br />At natural hillside: <br />Over widespread areas: <br />From downstream foundation area: <br />"Boils" beneath stream or ponded water: <br />Cracks or scarps on crest: <br />Cracks or scarps on slope: <br />Sloughing or bulging on slope: <br />*Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />18 *Clogging <br />     Spillway channels and pipes: <br />     Decant system: <br />     Diversion ditches: <br />*Water impounded against toe: <br />Existing embankment freeboard (4.8' is normal) = 4.8' <br />          Increase            Decrease in water level:  Decrease <br />Cracks, bulging, or erosion on upstream face: <br />Visible sumps or sinkholes in slurry surface: <br />*Major adverse changes in these items could cause instability and should be reported to the Engineering Manager  <br />and Mine Superintendent for further evaluation.  Adverse conditions noted in these items should normally be  <br />described (extextent, location, volume, etc.) here: all water being discharged out of old underdrain pipe <br />19 *Cracking or crushing of pipes <br />     Spillway pipes: <br />     Decant system: <br />Trash racks clear and in place: <br />Discharge rate (gpm) = 33