Laserfiche WebLink
8/22/2016 State.co.us Executive Branch Mail - Fwd: FW: FW: FW: LorencitoTR-19 Adequacy Letter Response <br />Rob <br />P 303.866.3567, extension 8113 1 F 303.832.8106 <br />I'll 11111111ww", 11111 IS III I <br />id <br />On Sun, Jul 24, 2016 at 1:41 PPN. Ron Thompson <monthompaon@newe|kooaioom> wrote: <br />Jerry, <br />| would expect that both the sediment load and the volume of water from u1O-24year-hour event would <br />decrease after reclamation. |fthe ponds were constructed tomeet the disturbed run-off volume; then after <br />reclamation the difference between the as -built total pond volume and the calculated reclaimed storm run-off <br />would be available for extra sediment storage. <br />Ron <br />From: Knbitz,Jerry [maiKoJerry.KobUz@arcadis.cmm] <br />Sent: Friday, July 22 30163:10PM <br />To: robzuber@state.co.us <br />Cc: Ron Thompson; KnUitz,Jerry <br />Subject: FW: FW: FW: Lorencito TR -19 Adequacy Letter Response <br />EM <br />The slightly increased elevation is due to the assumption that the pond is currently on the designed sediment <br />elevation without any clean-out. <br />hftps://mai|.google.com/mail/u/0/?ui~2&i�e29129fcb5&vi ew=pt&search= inbox&th= 1m|~156a43fcd264089u 3/10 <br />