My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-19_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2016-08-19_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:00 PM
Creation date
8/22/2016 10:33:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
8/19/2016
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Tri-State Generation and Transmission Association
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Unit cost: $43.62 per acre Total job cost: $100,565 <br />BULLDOZER WORK <br />Task description: Section 25 Pond Removal <br />Site: Colowyo Coal Mine <br />PROJECT IDENTIFICATION <br />Permit Action: PR4 <br />Task #: 527 State: Colorado <br />Date: 8/5/2016 County: Moffat <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/flour: <br />Page 27 of 67 <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: C019-527 <br />$97.48 <br />Utilization % <br />NA <br />$103.60 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$38.89 <br />NA <br />Total unit Cost/Hour: $239.97 <br />Total Fleet Cost/Hour: $239.97 <br />MATERIAL QUANTITIES <br />Initial Volume: 11,667 <br />Swell factor: 1.125 <br />Loose volume: 13,125 LCY <br />Source of estimated volume: Exh 7,Item 23,Fig. C6 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency <br />description: <br />120 feet <br />1,093.1 LCY/hr <br />Compacted fill or embankment 0.9 <br />Average push 0% <br />gradient: <br />Average site altitude: 6,900 feet <br />Material weight: 2,650 lbs/LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.