Laserfiche WebLink
Page 21 of 67 <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 80.00 (unadjusted): $1,207,076.74 location): $1,185,349.36 <br />CIRCES Cost Estimating Software <br />fabric - to 6 ft. <br />high <br />remove <br />500'1 x 400'w <br />Fencing, chain <br />1,800.00 <br />LF <br />$3.05 <br />$5,490.00 <br />fencing at <br />link, including <br />outside storage <br />posts and <br />fabric - 8 ft. to <br />10 ft. high <br />Primary <br />420 ft. 1 <br />Conveyor, <br />420.00 <br />LF <br />$53.42 <br />$22,436.40 <br />crusher <br />elevated, <br />including <br />supports - 8 ft. <br />Wx10ft. H <br />housing <br />remove <br />24000 ft. <br />Powerline or <br />24,000.00 <br />LF <br />$5.39 <br />$129,360.00 <br />powerline <br />utility line, <br />(map 22B) <br />overhead, <br />wood - Double <br />or "H" pole <br />Total Cost <br />Subtotal (adjusted for <br />Job Hours: 80.00 (unadjusted): $1,207,076.74 location): $1,185,349.36 <br />CIRCES Cost Estimating Software <br />