Laserfiche WebLink
Page 60 of 67 <br />TRUCK/LOADER TEAM WORK <br />Task description: Haul Spoil from Temp spoil pile to Collom pit (2017 W -C) <br />Site: Colowyo Coal Mine Permit Action: PR4 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 551 State: Colorado <br />Date: 8/4/2016 County: Moffat <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: <br />-Loader: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance -Motor Grader: <br />-Water Truck: <br />Cost Breakdown: Truck/Loader Team <br />Abbreviation: None <br />Filename: C019-551 <br />Shift basis: 2 per day <br />KOMATSU 830E <br />LETOI RNEAU L2350 <br />Cat D9T - 9SU <br />NA <br />CAT 160M <br />Water Tanker, 10,000 Gal. <br />SuDDort Eauimnent <br />Maintenance Eauipment <br />Total work team cost/hour: $8,304.45 <br />MATERIAL OUANTITIES <br />Initial volume: 51,700,000 CCY Swell factor: 1.000 <br />Loose volume: 51,700,000 LCY <br />Source of estimated volume: Exhibit 1313, Table 4 <br />Source of estimated swell factor: Exhibit 13B Table 2 <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,650 Pounds/LCY <br />Description: Decomposed rock - 25% Rock, 75% Earth <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />100 <br />NA <br />75 <br />50 <br />Ownership cost/hour: <br />$181.12 <br />$348.37 <br />$97.48 <br />NA <br />$41.96 <br />$59.07 <br />Operating cost/hour: <br />$236.35 <br />$454.81 <br />$103.60 <br />NA <br />$35.45 <br />$52.54 <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. <br />cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$22.25 <br />$38.60 <br />$38.89 <br />NA <br />$35.83 <br />$0.00 <br />Unit Subtotals: <br />$439.72 <br />$841.78 <br />$239.97 <br />NA <br />$113.23 <br />$111.61 <br />Number of Units: <br />14 <br />2 <br />1 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: $7,839.64 <br />Support: $239.97 <br />Maint: $224.84 <br />Total work team cost/hour: $8,304.45 <br />MATERIAL OUANTITIES <br />Initial volume: 51,700,000 CCY Swell factor: 1.000 <br />Loose volume: 51,700,000 LCY <br />Source of estimated volume: Exhibit 1313, Table 4 <br />Source of estimated swell factor: Exhibit 13B Table 2 <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,650 Pounds/LCY <br />Description: Decomposed rock - 25% Rock, 75% Earth <br />CIRCES Cost Estimating Software <br />