Truck Travel (Haul & Return,) Time: <br />penetration 4.0 <br />Haul Route - <br />Page 55 of 67 <br />Road Condition: Rutted dirt, little maintcnance, no water, 1" tire <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />(%) <br />(fpm) <br />Time <br />(min) <br />1 <br />750.00 <br />5.00 <br />4.00 <br />9.00 <br />824 <br />0.946 <br />Haul Time: 0.946 minutes <br />Return Route: <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />(%) <br />(%) <br />(fpm) <br />Time <br />226.92 <br />LCY/Hour Adjusted for job efficiency: <br />188.35 LCY/Hour <br />Optimal No. of Trucks: <br />(min) <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />1 <br />750.00 <br />-5.00 <br />4.00 <br />-1.00 <br />3159 <br />0.297 <br />LCY/Hour <br />CIRCES Cost Estimating Software <br />Return Time: 0.297 <br />minutes <br />Total Truck Cycle Time: 4.093 <br />minutes <br />Loading Tool unit <br />Production <br />476.31 <br />LCY/Hour Adjusted for job efficiency: <br />395.34 LCY/Hour <br />Truck Unit Production <br />226.92 <br />LCY/Hour Adjusted for job efficiency: <br />188.35 LCY/Hour <br />Optimal No. of Trucks: <br />2 <br />Truck(s) Selected Number of Trucks: <br />2 Truck(s) <br />Adjusted hourly truck team production: 376.69 <br />LCY/Hour <br />Adjusted single truck/loader team production: 376.69 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 376.69 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) Total job time: 5.76 <br />Hours <br />Unit cost: <br />$1.407 <br />/LCY Total job cost: $3,050 <br />CIRCES Cost Estimating Software <br />