Laserfiche WebLink
Page 53 of 67 <br />TRUCK/LOADER TEAM WORK <br />Task description: Remove and dispose of Rip rap from ditches, Dl, D2, D3, D4 <br />Site: Colowyo Coal Mine Permit Action: PR4 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 534 State: Colorado <br />Date: 8/4/2016 County: Moffat <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Cat 725 <br />-Loader: CAT 950H <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Cost Breakdown: Truck/Loader Team <br />Abbreviation: None <br />Filename: C019-534 <br />Shift basis: 1 per day <br />NA <br />Cat D9T - 9SU <br />NA <br />NA <br />SuDDort Eauinment <br />Maintenance Eauinment <br />Total work team cost/hour: $529.96 <br />MATERIAL OUANTITIES <br />Initial volume: 2,168 CCY Swell factor: 1.000 <br />Loose volume: 2,168 LCY <br />Source of estimated volume: Ex. 7-2313, Table 1 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 3,300 Pounds/LCY <br />Description: Decomposed rock - 75% Rock, 25% Earth <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />50 <br />NA <br />NA <br />Ownership cost/hour: <br />$53.50 <br />$25.04 <br />NA <br />$97.48 <br />NA <br />NA <br />Operating cost/hour: <br />$45.39 <br />$36.17 <br />NA <br />$51.80 <br />NA <br />NA <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. <br />cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$22.10 <br />$38.60 <br />NA <br />$38.89 <br />NA <br />NA <br />Unit Subtotals: <br />$120.99 <br />$99.81 <br />NA <br />$188.17 <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: $341.79 <br />Support: $188.17 <br />Maint: $0.00 <br />Total work team cost/hour: $529.96 <br />MATERIAL OUANTITIES <br />Initial volume: 2,168 CCY Swell factor: 1.000 <br />Loose volume: 2,168 LCY <br />Source of estimated volume: Ex. 7-2313, Table 1 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 3,300 Pounds/LCY <br />Description: Decomposed rock - 75% Rock, 25% Earth <br />CIRCES Cost Estimating Software <br />