My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-19_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2016-08-19_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:00 PM
Creation date
8/22/2016 10:33:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
8/19/2016
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Tri-State Generation and Transmission Association
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Regrade ditch D4 <br />Site: Colowyo Coal Mine Permit Action: PR4 <br />PROJECT IDENTIFICATION <br />Task #: 529 State: Colorado <br />Date: 7/21/2016 County: Moffat <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $200.13 <br />Total Fleet Cost/Hour: $200.13 <br />Page 45 of 67 <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: C019-529 <br />$82.01 <br />Utilization % <br />NA <br />$79.23 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$38.89 <br />NA <br />MATERIAL QUANTITIES <br />Initial Volume: 2,726 <br />Swell factor: 1.125 <br />Loose volume: 3,067 LCY <br />Source of estimated volume: Exhibit 1313-T-21, Table 8 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly 1,400.0 LCY/hr <br />production: <br />Materials consistency Compacted fill or embankment 0.9 <br />description: <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />7,500 feet <br />2,650 lbs/LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.