Laserfiche WebLink
Table L-1 Reclamation Task and Cost Estimate <br /> Activity Description Time Months Cost $ <br /> Dewatering Phase 1 lake 0.25 6570 <br /> Backfill lake 1.0 211992 <br /> Backfilling 1000 feet of 20 foot tall hi hwall to 3HAV. 0.5 18000 <br /> Backfill and grade detention pond 0.25 9300 <br /> Rip road areas 0.25 1000 <br /> Replace topsoil on all disturbed areas 1.0 61952 <br /> Remove all facilities and equipment 0.25 5000 <br /> Seed and mulch all to soiled areas 0.25 17920 <br /> Totals 2.5 $331,734 <br /> DRMS Costs 28% x direct costs $92,886 <br /> Total Bond Amount $424,620 <br /> 5 Mile Pit March 2016 L-2 <br />