My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-18_PERMIT FILE - P2016022 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2016022
>
2016-08-18_PERMIT FILE - P2016022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2020 4:22:19 AM
Creation date
8/19/2016 2:16:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2016022
IBM Index Class Name
Permit File
Doc Date
8/18/2016
Doc Name
Application
From
Kinross Gold USA, Inc.
To
DRMS
Email Name
THM
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Golden Wonder Project- Notice of Intent- Private Lands Prospecting Only <br /> Appendix A-General Reclamation Cost Estimate Summary <br /> Golden Wonder Project-Private Lands <br /> Hinsdale County,Colorado <br /> Sections 2,3,4,10 and 11,T43N, R4W New Mexico Meridian <br /> Reclamation <br /> Reclamation Type Site Total Total Cost Estimate Total Cost Comment <br /> Feet/Acres Acres Hours $/hour <br /> Access Road-25'width Equipment 1,975 1.13 16 $94.54 $1,512.64 <br /> Labor 0 16 $38.39 $614.24 <br /> Drill Pads-50'x 50'with sump Equipment 0.86 0.86 24 $94.54 $2,268.96 <br /> Labor 24 $38.39 $921.36 <br /> Revegetation Equipment-Materials 1.99 1.99 24 $135.00 $3,240.00 Includes 25%Initial Failure <br /> Labor 24 $45.00 $1,080.00 and one re-seeding <br /> Drill Hole Plugging-Wet Equipment-Materials 1000' 1000 10 $2.50 $2,500.00 Estimate for a single hole <br /> Labor 10 $50.25 $502.S0 only one hole open at a tim <br /> Equipment Mob-Demob Equipment 10 $123.98 $1,239.80 Mob/Demob <br /> Labor 10 $58.42 $584.20 from Lake City,CO <br /> Subtotal $14,463.70 <br /> Project Administration-%31 Total Overhead $4,483.7S <br /> Liability Insurance 2.02 <br /> Performance Bond 1.05 Total $18,947.45 <br /> Supervision 13.8 <br /> Profit 10 <br /> Legal/Engineering/PM 5 <br /> Contingency 3 <br /> 8/15/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.