Laserfiche WebLink
Exhibit C <br />reclamation plan for the site will remove the potential for future <br />off-site damage. <br />Stable configuration -- The borrow area's slopes will be finished <br />to a maximum 3:1 slope. <br />This slope gradient, the features of the reclamation plan and <br />the natural properties of the site's soils will result in a stable <br />configuration of the reclaimed site that be suitable for the <br />intended future use — rangeland. <br />(m) On-site processing. <br />There will be no on-site processing of the borrow materials. <br />(n) Commodities to be extracted and their use <br />The only commodity to be extracted at this site is the sandy <br />soil. The material will be used for fill purposes on a county <br />highway improvement project along Weld County Road 49. <br />(o) No incidental products will be mined at the borrow site. <br />(p) No explosives will be used in the operations at the borrow site. <br />Page 4 of 4 <br />