Laserfiche WebLink
Exhibit C <br />Applicant: Ames Construction, Inc. <br />Name of Site: Front Range Feed Lot Borrow <br />Date: July 27, 2016 <br />EXHIBIT C — Mining plan <br />(a) Commencement and Duration of Borrow Operation <br />The borrow operation is for a single specific project. <br />Operations would begin on September 6, 2016 and would be <br />complete by November 30, 2017. <br />This time window includes the following phases: <br />1. Topsoil salvaging and haul road construction; <br />2. Excavation and hauling of the borrow materials, <br />3. Excavation from the existing road brought back into the <br />borrow hole <br />4. Closing of the borrow — final grading of the slopes, <br />topsoil placement, and completion of the reclamation <br />plan. <br />(b) Topsoil replacement depth. <br />The existing topsoil conditions in the area show an average of 3 <br />inches. This topsoil will be stockpiled and respreads at the end <br />at the depth or thicker. <br />(c) Overburden <br />The borrow materials do not have any overlying overburden or <br />waste materials. <br />(d) Thickness of deposit to be mined <br />A ten foot thickness maximum of borrow material will be <br />removed. <br />Page 1 of 4 <br />