My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-16_REVISION - M1985001
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985001
>
2016-08-16_REVISION - M1985001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:15 PM
Creation date
8/18/2016 2:54:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985001
IBM Index Class Name
Revision
Doc Date
8/16/2016
Doc Name
Request for Technical Revision
From
Glacier Gravel Products
To
DRMS
Type & Sequence
TR1
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coy <br />e <br />k . COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1876 *8� 1313 Sherman Street, Room 215, Demer, Colnrado 80203 ph(303) 866-3567 <br />xr'ROl <br />REQUEST FOR TECHNICAL REVISION (TR) Cve6. t <br />File No.: M- 1 985-00 1 <br />County La Plata <br />Site Name: J&J Pit Annual Report(Due 6127) <br />✓0 Viol EI <br />TR# DRMS Use onl ZQls <br />Permittee: <br />Jim Helmericks d/b/a Glacier Gravel Products AU <br />Ar. REOW <br />WET <br />Operator (If Other than Permittee): Jim Helmericks contracts with various firms to operate: see details i MELMN% <br />Permittee Representative: Nathan A. Barton and Jim Helmericks <br />Please provide a brief description of the proposed revision: <br />Revise/replace Exhibits C, D and L, supplement Exhibit E, add Geotechnical Stability Exhibit <br />. <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />I IOc, 111, 112 construction Elmaterials, and 112 quarries $215 <br />112 hard rock (not DMO) $175 ❑ <br />110d, l I2d(1, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.