Laserfiche WebLink
j' .0 <br />S COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />`� 1313 Sherman Street Room 215 Denver Colorado 80203 h{303) 866-3567 <br />1876. I I f r RECEIVEC <br />REQUEST FOR TECHNICAL REVISION TR COVER SHEET AUG 16 2016 <br />File No.: M- M-2006-018 Site Name: North Bank Pit <br />County, <br />Garfield <br />DMSiON OF REMWIrl <br />_—MNM SAFELY <br />TR# DRMS Use only) <br />a/Permittee: Oldcastle SW Group, Inc. dba United Companies <br />v. <br />Operator (If Other than Permittee): TROD <br />Permittee Representative:Jason Burkey ✓Complied! <br />Please provide a brief description of the proposed revision: U Violations <br />Revise seed mix for reclamation - see attached proposed seed mix and an email from the land <br />owners giving their approval. <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Tvoe Required TR Fee Submitted (mark only one) <br />110c, 111, 112 construction R7materials, and 112 quarries $216 <br />112 hard rock (not DMO) $175 ❑ <br />110d, I 12d(1, 2 or 3) $1006 ❑ <br />