Laserfiche WebLink
C) <br /> RPM,Inc. <br /> Grisenti Faimis Long Teri Anpientation Plan <br /> If necessary-reservoir water <br /> from up to 60 Twin.Likes <br /> shares owned by Transit NL- <br /> will be released to the Arkansas <br /> r River for replacement of lagged <br /> J <br /> Lester.4tte�ery <br /> v6 DAch Headgate winter time stream depletions. <br /> Arkansas River <br /> Lester Atterben-Ditch historical consumptive use credits will be <br /> delivered to Pond 1 donne the irrigation season.The ditch credits will <br /> Evap. recharge the aquiferxia the pond and slowly accrue to the Arkansas <br /> Net Recharge to ------- r r River.providing a year-round augmentation credit- <br /> the Arkansas River <br /> Pond I <br /> Su torn S DR <br /> continuous <br /> recorder&flume <br /> Net inflow ofaffirvial <br /> Evaporative depletions occurring from Pond 2 will be replaced as part of <br /> ground water to Pond 2. Pond <br /> the recharge pond operations in Pond 1.If necessary.release of Twin <br /> Lakes Reservoir water will be used as a supplement supply to provide <br /> for anv shortage of Crater. <br /> RPM,Inc.,22151 E.Euclid PI.,Aurora,CO 80016 Phone:(303)854-7499 Email:h1humphries2(41,comcast.net <br />