Laserfiche WebLink
8/11/2016 Gmail-44th Lane Project n Pueblo County <br /> To: farmerswiley@gmail.com <br /> Cc: Tyler O'Donnell <tyler.odonnell@state.co.us>, Johnie Abad -DNR<johnie.a.abad@state.co.us>, Tony Waldron - DNR <br /> <tony.waldron@state.co.us> <br /> Dear Doug and Kim Wiley: <br /> On August 4, the Division of Reclamation, Mining and Safety received your email. Please note the Division considers <br /> email to be informal communication and the receipt of your email might not constitute an official objection to the <br /> application. Pursuant to Construction Materials Rule 1.7.1(2)(a), written comments, protests and/or petitions must <br /> contain the name, mailing address and phone number of the interested party. Your email communication did not provide <br /> a mailing address, a requirement under Rule 1.7.1(2)(a)for official objections. Therefore, please follow-up your email <br /> with official correspondence, reiterating your concerns stated in your email, providing the information required under Rule <br /> 1.7.1(2)(a), and bearing your signature(s). In your official correspondence, please include a copy of this email train, as <br /> reference of the date of receipt of your original email. <br /> The Construction Materials Act and Rules are available through the Division's web site at http://mining.state.co.us, and <br /> specifically at the following links: <br /> • Construction Materials Act at http.//mining.state.co.us/SiteCollectionDocuments/Title%2034°/fl2OArticle%2032.5°/b <br /> 20Certified%202015.pdf <br /> • Construction Materials Rules at http://mining.state.co.us/SiteCollectionDocuments/Revised- <br /> ConstrMatadoptedAug92006indexed.pdf <br /> The Division will process your email as an objection to the application but as explained above, your email does not <br /> satisfy the requirements of Rule and as such may be disqualified. Therefore, if you desire to be counted as an official <br /> objector to the application and secure party status in these legal proceedings, please submit an official correspondence, <br /> clarifying how you are aggrieved by the proposed mining operations and entitled to legal protection under the Act (see <br /> Construction Materials Rule 1.1(34.1)), and providing the information required under Rule 1.7.1(2)(a), and bearing your <br /> signature(s). <br /> Please contact me or staff member Tyler O'Donnell if you have additional questions, our contact contact information is <br /> provided below. <br /> Wally Erickson <br /> [Quoted text hidden] <br /> Tyler O'Donnell <br /> Environmental Protection Specialist II <br /> • COLORADO <br /> Division of Reclamation, <br /> Mining and Safety <br /> ,. , , <br /> P 303.866.3567 x 8131 1 F 303.832.8106 1 C 303.319.5842 <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 <br /> Tyler.ODonnelI@state.co.us 1 http://mining.state.co.us <br /> Wally Erickson <br /> Senior Environmental Protection Specialist <br /> • COLORADO <br /> Division of Reclamation, <br /> Mining and Safety <br /> P 303.866.3567 ext. 8176 I F 303.832.8106 <br /> 1313 Sherman Street, Room 215, Denver, Colorado 80203 <br /> wally.erickson@state.co.us I http-//mining.state.co.us <br /> https://mail.google.com/mail/LdOPu=2&ik=6ee7082879&view=pt&q=gravel%20pit&gs=true&search=query&th=1 siml=1 ... 212 <br />