8/17/2016 State.co.us Executive Branch Mail-Fwd:FW:Urgent-POs for Sage Creek Mine <br /> To: Watterson, Brian <br /> Cc: Long, Dave L; Nettleton, Jerry; Brady, Ed <br /> Subject: Re: Urgent - PO for Sage Creek Mine <br /> Assuming I can put a req. in for Sage Creek, I will create a work order with a req. when I get back to the mine this <br /> afternoon. Otherwise, Ed can enter the req. <br /> Mike <br /> Sent from my iPhone <br /> > On Aug 5, 2016, at 9:57 AM, Watterson, Brian <BWatterson peabodyenergy.com> wrote: <br /> > My understanding is that I'm not authorized to put in a req for Sage Creek. Mike was going to work on that. <br /> > -----Original Message----- <br /> • From: Long, Dave L <br /> > Sent: Friday, August 05, 2016 9:55 AM <br /> > To: Watterson, Brian; Herndon, Sadie <br /> > Cc: Nettleton, Jerry; Berdine, Mike; Blomquist, Miranda; Sollars, Pat <br /> > Subject: RE: Urgent - PO for Sage Creek Mine <br /> > Brian, <br /> > Do you have a req number so I can begin processing your emergency po? <br /> > David L Long <br /> > Category Manager Americas <br /> > Supply Chain Management <br /> > dave_long peabodyenergy.com <br /> > Routt County Road #27 29515 <br /> > Oak Creek , CO 80467 <br /> > 970-870-2705 Phone <br /> > 970-870-8769 Fax <br /> > 720-201-3255 Mobile <br /> > -----Original Message----- <br /> • From: Watterson, Brian <br /> > Sent: Friday, August 05, 2016 9:48 AM <br /> > To: Long, Dave L; Herndon, Sadie <br /> > Cc: Nettleton, Jerry; Berdine, Mike; Blomquist, Miranda <br /> > Subject: Urgent - PO for Sage Creek Mine <br /> > Dave: <br /> > We received notice from the Division of Reclamation Mining and Safety (DRMS)that we need to remove a leaking <br /> culvert from the dam of Pond 004 at the Sage Creek Mine, or receive a violation. They have given us a deadline of <br /> August 12 to initiate the work. I met with Joe Bower yesterday who looked it over. I've attached his cost estimate. The <br /> Phase I work entails: <br /> > - Excavation, removal and disposal of about 50 feet of 18-in culvert and old head gate. <br /> > - Excavation of about 50 - 100 cubic yards of borrow clay in the area for additional compaction material <br /> > -Working with NWCC to compact that material in a series of lifts. This will require a roller. <br /> > - Dewatering - During the construction period, springs feeding the pond will need to be pumped to an adjacent drainage <br /> channel. Note that the pond is almost empty because of the leaking culvert. <br /> > We'd like to get started early next week, as the inspector may be out later in the week. Please put in a PO for this. <br /> > Contact us if you need additional information. <br /> > Note- We have a secondary project related to this pond (Phase 11). This is also being driven by the DRMS inspector. <br /> He pointed out that Colorado State Water Resources has design requirements for permanent impoundments, that we <br /> currently don't meet. While the pond is almost drained, we'd like to dredge out excess silt and vegetation and <br /> reconfigure the pond and add head gate drainage, so that it's a sanctioned Water Resources reservoir. This will also <br /> hftps://mail.googl e.com/m ai I/u/0/?ui=2&i k=e29129fcb5&view=pt&search=i nbox&th=l5675be6l5675bf2&si m l=15675be6l 5675bf2 2/4 <br />