My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-13_PERMIT FILE - P2016020 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2016020
>
2016-08-13_PERMIT FILE - P2016020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 10:42:35 PM
Creation date
8/16/2016 9:46:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2016020
IBM Index Class Name
Permit File
Doc Date
8/13/2016
Doc Name
Compliance Order on Consent and Settlement Agreement
From
Minewater
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notwithstanding that MineWater agrees to the payment of the civil penalty imposed hereby in <br /> accordance with the terms hereof, as applied to MineWater, the civil penalty to be paid pursuant <br /> to this paragraph is not meant to penalize or fine MineWater in any way because MineWater did <br /> not commit any of the violations of the Act described above and did not own or operate the <br /> London Mine when such violations occurred. <br /> 52. Neither London Mine, LLC, the Estate, the Personal Representative, Meyer, THE nor PCMD#9 has <br /> any performance or payment obligations under this Consent Order and Settlement Agreement. <br /> STIPULATED PENALTIES <br /> 53. MineWater agrees that it shall pay a stipulated penalty payment for each zinc, cadmium, and total <br /> suspended solids ("TSS") effluent violation reported under the Water Tunnel Permit subsequent to <br /> closing and the Parties execution of this Consent Order and Settlement Agreement and prior to <br /> September 30, 2018. In the event that a TSS effluent violation occurs, the stipulated penalty will <br /> be $750.00. In the event that a zinc or cadmium effluent violation occurs during a monitoring <br /> period, the magnitude of the penalty will be based on ambient water quality conditions. Should <br /> the ambient water quality monitoring data collected pursuant to paragraph 45 establish an <br /> exceedance of the applicable Water Quality Control Commission stream standard for zinc and/or <br /> cadmium in Segment COSPUS02c during the monitoring period, the stipulated penalty for such <br /> effluent violation(s) will be increased to the Tier 2 exceedance level set forth in the table, below. <br /> On the condition that the quality of the effluent from the Water Tunnel Facility does not <br /> deteriorate from the current quality and that MineWater is at all times property operating and <br /> maintaining all facilities and systems of treatment and control at the Water Tunnel Facility, the <br /> Division and MineWater agree that the following stipulated penalties shall apply to zinc, cadmium, <br /> and TSS effluent violations that occur following the Parties' execution of this Consent Order and <br /> Settlement Agreement and lasting through September 30, 2018, so that the maximum stipulated <br /> penalty incurred for any month is set forth below: <br /> MineWater <br /> STIPULATED PENALTY TABLE <br /> Tier 1 Stipulated Penalty Tier 2 Stipulated Penalty <br /> Penalty per month for Penalty per month for <br /> PARAMETER effluent violation and no effluent violation and an <br /> exceedance of stream exceedance of stream <br /> standard standard <br /> Zinc, potentially dissolved $750 $1,200 <br /> Cadmium, potentially dissolved $750 $1,200 <br /> Total Suspended Solids $750 NA <br /> 54. Following MineWater's submittal of a DMR that establishes Water Tunnel Permit effluent <br /> violation(s) for zinc and/or cadmium and/or TSS during a monitoring period, MineWater agrees <br /> that it will make a stipulated penalty payment within sixty (60) calendar days of its DMR <br /> submittal. All payment of stipulated penalties shall be made in the same manner set forth in <br /> paragraph 51 above and MineWater shall include a cover letter outlining MineWater's methodology <br /> of determining the stipulated penalty amount. <br /> London Mine, LLC, et at. C O L O R A D O <br /> Compliance Order on Consent and Settlement Agreement �® Department of Public <br /> Page 13 of 23 Health 6 Environment <br />
The URL can be used to link to this page
Your browser does not support the video tag.