Ms. Ioana Comaniciu, P.E. <br /> June 22, 2015 <br /> Page 4 <br /> Water Balance <br /> In order to meet the criteria outlined in the guidelines for a lined reservoir, the leak test must <br /> demonstrate that the steady state condition for design or performance standard is: <br /> Qdesign = 53.0 gpm Qpump + Qevaporation - Qprecipitation <br /> Qpeiforrnance= 159.0 gpm>Qpump+Qevaporation - Qprecipitation <br /> The required facilities and measuring equipment will be in-place and operational prior to the start <br /> of the leak test. If you would like to see the leak testing procedure please contact me and we will <br /> schedule a time to meet on-site. <br /> Please call with your availability for and a site meeting and if you have any questions or <br /> comments. <br /> Sincerely, <br /> DEERE& AULT CONSULTANTS, INC. <br /> Derek H. Foster, P.E. <br /> Project Engineer <br /> Attachments <br /> cc: Ben Frei <br /> Q30247 Albert Frei S Sons\0247.011 Stagecoach Leak Test\leak Tesl\t0 Day 2015\Stagecoach 30 Day Leak Test Plan.hrdocx <br />