My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-08_PERMIT FILE - P2016011 (3)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2016011
>
2016-08-08_PERMIT FILE - P2016011 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:35 PM
Creation date
8/16/2016 9:39:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2016011
IBM Index Class Name
Permit File
Doc Date
8/8/2016
Doc Name
Revised Form 2
From
Mineral Mountain Gold LLC
To
DRMS
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(FORM 2 - Public filing) <br />Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Topsoil varies from 0.5 feet to 2 feet depending on location on site. Hilltops have less, and valley <br />bottoms nave more. Any top soil encountered unng surface CliStUMDing exploration activities Will e <br />ra-moved- And segregated Into m rn;l OnGkpile at the e ge of the disturbed 2r@2 Redmak miaterials. <br />located below, will then be moved separately. Upon completion of the exploration of the site, the <br />bedrock materials will be replaced and any previously stockpiled soils will be used as cover. The areas <br />will then be revegetated as seen as praetleal (less then 5 yeafs), with the pFefeFFed UFne of seeding being <br />in fall or spdnq to take advanta4e of seasonal moisture and natural cycles to establish vegetation. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Mutes for required Abandonment procedures): <br />Since no holes are anticipated to encounter groundwater, all drill holes will be securely <br />capped, in accordance with Rule 5.2.4 (5) ("securely capped as approved by this office") <br />And a repoFt shall e Med with e office as required under Rule 5. 7. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />No portals, shafts, ponds, or significant excavations are anticipated. If found to be <br />necessary, any drill pads that might be constructed on non -previously disturbed land will <br />be returned to approximately the original contour, will be covered with removed solls or <br />grewth media, and seeded with a - Feeified by the Tellef Geunty Sell <br />Cinnsaryntinn District, a private sped company. or byan enponger- Any mtjd pits, if "rLad, <br />will be closed by pumping the cuttings and drill fluid into the drill hole, and covered as part <br />of the reclamation of the drill pad area. Any other new disturbances will be treated in a <br />manner similar to drill pads. <br />11. Describe how roads will be reclaimed or returned to their pre -prospecting (or better) condition: <br />Existing roads and provia- u -a disturbances that are not part a the existing NOI 1986-023 <br />are not hart of the affected acreage, so will be left in anoroximately their previous condition <br />prior to exploration. Any disturbances that occurred under NOI 1986-023, along with roads <br />that might be constructed In newly disturbed areas will a reclaimed, opsol rep ace , an <br />seeded witi i a, i app, opriate gi ass , , oix whe, , no longe, needed. As sl iow, 1 above, 0, Ily Vel y <br />of P-1986-023 following DRMS acceptance of this NOI. <br />
The URL can be used to link to this page
Your browser does not support the video tag.