Laserfiche WebLink
Final -Restoration and Compliance Plan for May Day Idaho Mine Complex <br />Administrative Order for Compliance, Docket No. CWA-08-2012-0011 <br />4. Revegetation will be completed, including for adjacent upland areas. <br />5. The work will be documented with as-built drawings and photos. <br />6. The areas will be observed periodically after completion of the work to note their <br />progress and identify any deficiencies. <br />7. Follow-up monitoring will be completed to ensure the work was completed according to <br />the plans. <br />4.1 RESPONSIBLE PARTY <br />The party responsible for completing the work included in this Plan is: <br />Wildcat Mining Corporation (R Squared Inc.) <br />George Robinson, CEO <br />3926 North State Highway 67 <br />Sedalia, Colorado 80135 <br />303-832-7664 <br />georgerobinson@r2incorporated.com <br />This Plan was prepared by: <br />Dave Mehan, Professional Wetland Scientist <br />Bikis Water Consultants, a division of SGM <br />555 River ate ~ ane, Suite ~4-82 <br />Durango, Colorado 81301 <br />970-385-2340 <br />davem@sgm-inc.com <br />June 2016 Bikis Water Consultants, a division of SGM Page 6 <br />Case 1:16-cv-02008-WYD Document 2 Filed 08/08/16 USDC Colorado Page 36 of 82