My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-10_REPORT - M2004009
>
Day Forward
>
Report
>
Minerals
>
M2004009
>
2016-08-10_REPORT - M2004009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:44 PM
Creation date
8/12/2016 10:22:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004009
IBM Index Class Name
Report
Doc Date
8/10/2016
Doc Name
Annual Fee/Report/Map
From
Asphalt Specialties Co., Inc.
To
DRMS
Annual Report Year
2016
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASCI —Turnpike Reservoir —Erie, Colorado <br />EEC Project No. 1134011 <br />August 8, 2016 <br />Page 2 <br />Earth Engineering Consultants, LLC <br />2 -NQ Ouf-l-, tAq> <br />Their resources includes personnel, heavy highway equipment such as Dozers, Front End Loaders, <br />Self -propel Compacter, Water Truck and 30 Yard Haul Trucks to place uniform lifts not to exceed 2-3 <br />foot lifts. The equipment, especially the dozer and compactor, simulate the compaction efforts <br />needed. Each lift is tested for percent compaction along with a Flex -Wall permeability testing <br />procedures; with field density results presented herein, and Flex Wall results being provided at a later <br />date. <br />The field density tests were completed at random locations and elevations in the embankment fill zone <br />as noted herein, and were performed in general accordance with ASTM Specification D6938. The <br />results of the field density tests completed by EEC personnel during the referenced period are shown <br />on the attached summary sheets. The field density test results, at the locations as described herein, <br />conformed to the minimum project compaction requirements of at least 90% of standard Proctor <br />maximum dry density (ASTM Specification D698) and were within the allotted moisture content range <br />of 7% to 18% of the material's optimum moisture content, as per the agreed upon CQC/QA plan dated <br />March 12, 2013. <br />Laboratory Testing <br />As per the CQC/QA plan, EEC personnel, during the site visit on July 5, 2016, obtained a relatively <br />undisturbed sample of the previously placed and compacted shale/siltstone bedrock material by hand <br />driving a "Shelby -tube" device approximately 12 to 18 -inches into the compacted zone. This was <br />performed to obtain a sample for hydraulic conductivity testing in general accordance with ASTM D <br />5084 Specifications. The sample was obtained at the general location of EEC Field Density Test No. 31. <br />Laboratory testing performed on the retrieved hydraulic conductivity sample included a remolded "Flex - <br />Wall Permeameter" test in general accordance with ASTM Specification D 5084 Method C, results are <br />shown below and are also included on the attached summary sheet. <br />Glo►�R�7I�ii`t''i :� tb IFELv <br />Hydraulic Conductivity Test Results <br />Laboratory Testing - Soil Classification <br />Hydraulic Conductivity <br />Sample ID <br />In -Situ In -Situ Dry Final Moisture Final Dry Hydraulic <br />Moisture, % Density, PCF Content, % Density, PCF Conductivity, cm/sec <br />6 <br />12.4 107.0 22.0 104.0 <br />2.O x H <br />Based on the reported field density test results and the laboratory test results as presented herein, this <br />phase/lift of the placed and compacted shale/siltstone bedrock material generally conforms to the <br />project specifications and the CQC/QA plan dated March 12, 2013. <br />
The URL can be used to link to this page
Your browser does not support the video tag.